8
Revision date: 06.02.09
End Panel Installation
END PANEL INSTALLATION (continued)
Repeat steps to install the next panel. Work from the center
14.
outward to install the remaining panels.
NOTE:
Upper panels include H-channel installed on both
sides and the bottom edge. The bottom H-channel is
common between upper and lower panels and connects
the two panels.
Finish the end wall using two (2) 6' x 12' panels on the
15.
outer edges of the end wall. Measure, cut, and install
panels as previously described.
Cut the outer 6' x 12'
panels so each is flush with the side wall hat channel and
installed side panels (if equipped) of the main building.
NOTE:
The edges of the two outer end panels must not
extend beyond the edge of the side wall hat channel and
installed sidewall panels. When installed, the panels of the
end wall and sidewall meet to form a finished edge at each
corner of the building.
Secure
any horizontal section of H-channel to the end wall
girt using Tek screws. See D in the diagram below.
Measure and cut a section of 104213 profile and install it
16.
along the outside of edge of each 6' x 12' panel to complete
installation (see drawing C).
Continue by reading the care and maintenance section.
17.
Panel pattern may vary. Refer to the panel diagrams
located in the Quick Start section for the layout of panels
for your end wall.
Sidewall Hat
Channel
104213
6' x 12'
Panel
C
Trim
excess panel
Trim
excess panel
Trim
excess panel
Ground Level
Trim
excess panel
104213
104213
Trim
excess panel
Trim
excess panel
4' x 8'
Panel
6' x 8'
Panel
6' x 8'
Panel
6' x 8'
Panel
6' x 12'
Panel
6' x 12'
Panel
6' x 8'
Panel
4' x 8'
Panel
4' x 8'
Panel
4' x 8'
Panel
C
D
D
D
D
104213
6' x 12'
Panel