4. With the saddle portion of the cable clamp in position, thread the nuts onto the U-bolt section of the clamp
and tighten slightly to maintain the position of the clamp on the cable.
5. Install a second cable clamp on the cable six (6) to eight (8) inches from the first clamp.
6. Tighten both clamps.
7. Remove the bolt from the jaw of the turnbuckle and position the cable end with the thimble into the jaw of
the turnbuckle. (Assemble as shown above.)
8. Insert the bolt through the eye of the turnbuckle and the cable thimble, thread the nut onto the bolt, and
tighten.
9. Repeat Steps 2-8 for the remaining length of cable for this assembly.
10. Open the turnbuckle to its longest position.
11. Repeat the above procedure for all remaining cable assemblies.
Cable Placement
The diagram and figures below identify the placement and proper way to attach the cable assemblies to the
building.
NOTE:
The positions of the cable assemblies are identical for the opposite side and the remaining end of the
building that are not shown.
Cable A
Cable B
Cable C
ATTENTION:
Consult the All Frame
Diagrams for the rafter spacing and
cable locations for your shelter.
ATTENTION:
Install a carriage bolt
in this location at both ends of the
shelter.
Drill through the rafter and purlin to
install the bolt.
Frame shown may
differ from yours.
Consult the All Frame
Diagram for your
frame.
Visit www.ClearSpan.com for additional products and customer assistance.
14 of 40