background image

 

ООО "Бассейн-Сервис" – продажа и монтаж оборудования для бассейнов.

 

Тел: 8 (800) 700-65-50

www.bassein-servis.ru

 

 

 

If the fuse was NOT BLOWN, and you get no output at all, check back of circuit board for anything unusual - loose parts, burn 
marks, etc. If this is the case, return the CIRCUIT BOARD ONLY to your dealer or return to 

Clearwater Enviro Tech, 

prepaid 

postage.

 

Clearwater Enviro Tech 

will repair the unit at no charge if it is inside the 5 year warranty period (sales slip required or 

returned warranty card on our file) and assuming all conditions were following as noted on the 5-Year Warranty Card. If the 
unit is not covered under warranty, the customer will be notified by phone or writing as to what the charge will be to repair.

 

REMOVING THE CIRCUIT BOARD

 

If the control box needs to be replaced for any reason, the unit was designed so that only the circuit board needs to be 
checked out. This allows for all external electrical connections and the enclosure to remain at the same location during repair.

 

To remove the circuit board, follow these steps:

 

A.) Unscrew the two (2) screws holding the clear cover. 
B.) Lift clear cover.

 

C.) Lift up circuit board - under the decal. 
D.) Unplug connector going to circuit board.

 

E.) Remove circuit board and return to dealer or to 

Clearwater Enviro Tech.

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

 

 
 
 

Phone: 727-562-5186 • www.clearwater-enviro.com

 

Summary of Contents for MineralPURE SPA-1R

Page 1: ...с продажа и монтаж оборудования для бассейнов Тел 8 800 700 65 50 www bassein servis ru INSTALLATION SPA CARE MANUAL MODEL SPA 1R Outdoor Unit FOR ALLSPAS UP TO 2 000 GALLONS Phone 727 562 5186 www clearwater enviro com ...

Page 2: ...m CHLORINE OR BROMINE Always make sure there is some chlorine or bromine in the spa when first starting up the system as it may take several hours to fully ionize a spa Never add granular chlorine like HTH directly into the spa s water with the ionizer on It MUST be dissolved first or poured directly into the skimmer with the pump on Always make sure the water is clear before installing the ionize...

Page 3: ...ScaleBlaster to the system CYANURIC ACID Cyanuric acid is not required with the Clearwater Spa Purifier If the cyanuric acid level is over 150 ppm the spa should be partially drained and refilled with fresh water TOTAL DISSOLVED SOLIDS The Clearwater Spa Purifier requires some conductivity in the water for ionization to take place For the system to perform on maximum capabilities the TDS needs to ...

Page 4: ...If it is from copper pipe the copper was leached from a low pH of 7 0 or less Make sure the pH is maintained over 7 0 to prevent further copper leaching from the pipes You will only find copper piping near a heater or on very old houses If the source is from a copper based algaecide you can try shocking the spa with a lot of liquid chlorine to burn it out or simply start the ionizer up very low an...

Page 5: ... downward so that no air pocket can form in the electrode chamber If there is not enough give to allow insertion of the tee install unions 7 Screw the electrodes into the tee Generously wrap teflon tape around the electrodes several times before installing to prevent leaks INSTALLING THE SPA CONTROL BOX VOLTAGE SETTING 1 Before mounting the spa control box you must determine the voltage at the ins...

Page 6: ...his is all complete open up all valves and turn the power on Check for water leaks and all electrical connections for proper and firm connections SETTING THE CONTROL BOX Turn the control knob in a clockwise direction to turn the unit on To get the spa ionized as quickly as possible turn the control knob to Max so that you obtain the highest output With the proper pH readings the spa should be full...

Page 7: ...pa was just shocked with a lot of chlorine or bromine this can give you an improper test kit reading Always test the copper ion level before adding anything to the spa 9 Metal out removers As mentioned in the Sequestering Agent Level section in this booklet there are a few metal out removers or stain removers that can tie up the copper ion levels Test with a Sequestering Agent test kit or send wat...

Page 8: ... noted on the 5 Year Warranty Card If the unit is not covered under warranty the customer will be notified by phone or writing as to what the charge will be to repair REMOVING THE CIRCUIT BOARD If the control box needs to be replaced for any reason the unit was designed so that only the circuit board needs to be checked out This allows for all external electrical connections and the enclosure to r...

Reviews: