background image

Annual Maintenance Procedure 

FOR USE WITH CD10, CD10/AD, CD12 & CD12/AD 

 

 

 

 

 

 ClearWater Tech, LLC.

    

 

 

 

 

 

 

 

 

     Page 1 

 1.800.262.0203 • 805.549-9724  
 850-E Capitolio Way, San Luis Obispo, CA 93401 • email: service@cwtozone.com • www.cwtozone.com      

LIT228  Rev.100912 

Included in this maintenance kit: 

Pictured are the contents of a CD10/AD maintenance kit and an overview image of 
the CD10/AD. 
Numbered items correspond to descriptions below and their installed locations within 
the ozone generator. 
CD10, CD12 & CD12/AD systems will have similar maintenance kits and generator 
layouts.  They will have differences in quantity of parts, however the steps will be the 
same. 
The CD10 & CD12 kits will not have the media for internal air dryers (#6 & #7). 
The CD12/AD kit will not have indicating media (#7) 
CD12 & CD12/AD models will have a second set of o-rings (#5), as the units have 
two reaction chambers. 
 

Maintenance Will Involve the Following: 

1.  Cooling Filter: 

Clean or replace the cooling fan filter elements as required. 

2.  Inline Particulate Filter: 

Remove colored protective caps before installing the 

new filter. Re-tape threads with Teflon tape.  Orientation is universal.  

3.  Check Valves: 

Replace both check valves, one at the ozone generator and one at 

the injector.   Make note of check valve direction before removing old check valve 
and reinstall new valve in same direction. Re-tape threads with Teflon tape. 

4.  Fuses: 

Save the replacement fuses for use as needed.  

5.  Reaction Chamber O-Ring Replacement: 

See page 2 for reaction chamber 

maintenance instructions. 

6.  Air Dryer Media: 

See page 3 for air preparation maintenance instructions. 

7.  Indicating Media:

 See page 3 for air preparation maintenance instructions. 

 

 
Maintenance  of  the  ozone  system  is  critical  to  its  longevity  and  operating  efficiency.  Follow  the  steps  below  to  perform  the 
preventative annual maintenance.  If you have additional questions regarding the maintenance of your ozone installation, please consult 
the operation manual or contact your dealer. 

 
Before you start:  

System Shutdown Procedures 

Step 1: 

Turn off power to any peripheral 
system hydraulic components and 
air prep system. 

Step 2: 

Turn the Main Power switch on the 
ozone generator to the “OFF” 
position. The LED display on the 
front cover should 

not

 be 

illuminated.  

Step 3: 

Disconnect the power to the ozone 
system at the service disconnect 
box (if so equipped), main circuit 
breaker or by disconnecting the 
power cord.

  

Recommended Tools

 

Nut Drivers: 5/16”, 11/32” 
Screwdrivers: Phillips and flat-head  
O-Ring Removal Pick  
Hex Key: 7/64”  
Marking Pen  
Wrench: 5/8” or adjustable 
1” Ball hone (optional) 
Channel lock-type Pliers 
Snap Ring Pliers (for CD10/AD & 

CD12/AD) 

Cloth Shop Towel 
Denatured Alcohol 
Teflon Sealing Tape 

 

Video Walkthroughs

 

Visit our video channel at: 
http://www.youtube.com/ClearWaterTech  
These, and other procedures are shown. 

 
 
 
 
 

 

 
 
 
 
 
 
 
 

 

 
 
 
 
 
 

 

 

 

Reviews: