Condensing Economizers
Part No. 750-266
2-5
Structural integrity of the building should be verified (by others) prior to installing an economizer by
suspending from the ceiling.
Apply expansion joints (supplied by others) as required by the installation to ensure that no outside
forces from thermal expansion to either the exhaust gas connections or to the piping will be permitted.
Exhaust connections are generally mated with optional mating flanges and/or stack transitions. The
mating flanges can be butt or slip fit welded to the stack breaching once aligned. Ensure that the
economizer is level before final welding and/or bolting into position.
Figure 2.3 - Installation, vertical flow units
Summary of Contents for C1X Series
Page 1: ...Economizers 750 266 1 15 CRE CCE C2X C1X Operation Manual...
Page 2: ......
Page 6: ...vi NOTES...
Page 20: ...Standard Economizers 1 14 Part No 750 266 Figure 1 7 Piping with circulating tank BOILER...
Page 29: ...Condensing Economizers Part No 750 266 2 9 Figure 2 7 Dimension diagram C2X BB...
Page 33: ...Condensing Economizers Part No 750 266 2 13 Figure 2 9 Single boiler with deaerator...
Page 39: ...Condensing Economizers Part No 750 266 2 19 Figure 2 11 Two boilers with deaerator...
Page 51: ...Condensing Economizers Part No 750 266 2 31...
Page 52: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...