Chapter 8 — Inspection and Maintenance
Part No. 750-184
8-21
T. HEAD INSPECTION AND MAINTENANCE
!
Warning
Disconnect and lock out electrical power and fuel to the
boiler before opening either the front or rear head. Failure to
follow these instructions can result in electrical shock and
serious personal injury or death.
A good seal between the heads and the pressure vessel is necessary to
prevent leakage of combustion gases, loss of heat, and to aid in obtaining
operating efficiency. Leaks can also cause hot spots that can lead to
premature refractory failure and/or damage to the door metal.
When opening the heads, either for routine maintenance or for an annual
inspection, do not do so when the boiler or the door is hot. The refractory
will hold its temperature for some time and exposure to ambient temperature
or rapid cooling may cause refractory cracking and/or harm to the boiler and
head metal.
When opening the front head of a CB-LE, either remove the motor and fan
cassette assembly and swing the assembly away from the head. Or, with the
motor and cassette in place, remove the motor to davit arm connecting bolt
to allow swinging the motor and fan cassette with the head.
After confirming that the electrical power and fuel are locked in the
off
position, disconnect the fuel lines. Disconnect the main gas line coupling,
the pilot line and the sight port air line. If the boiler is oil fired, remove the
supply and return oil lines and the oil pilot line if necessary. Remove the
head bolts and swing the head.
The opened head should be supported by blocking or jacking to eliminate
possible deformation of the head or hinge area.
Front Head
Inspect the second to third pass baffle gasket. If it is brittle, cracked or
broken, replace the gasket.
Inspect the second to third pass baffle for a good seal at the tube sheet and
the vessel.
If necessary, scrape old cement away and clean out and wire brush the
sealing area to assure an effective bond between the high temperature
cement and the steel. Be sure not to obstruct the tubes with excess cement.
Scrape the old gasket material off the vessel to front head sealing area
(vessel to inner door, CB-OS) and the dry oven to front head sealing area (dry
oven to inner door, CB-OS). Using a wire brush clean off any excess gasket
material or rust. Using Spray Tack spray the area to hold the gasket in place
prior to closing the front head. Use new fasteners when replacing the tadpole
gasket.
Inspect the condition of the blanket insulation on the front head (inner door,
CB-OS). Replace the insulation if loose or torn.
CB-OS only: Replace the gasket on the inner door and secure with
new split clips. Close the inner door and bolt securely in place.
Tighten the bolts evenly around the dry oven using a star pattern.
Summary of Contents for CB Ohio Special 100 HP
Page 2: ...ii ...
Page 8: ...viii ...
Page 42: ...Chapter 2 Burner Operation and Control 2 22 Part No 750 184 ...
Page 116: ...Chapter 6 Adjustment Procedures 6 28 Part No 750 184 ...
Page 126: ...Chapter 8 Inspection and Maintenance 8 6 Part No 750 184 ...
Page 153: ...Chapter 9 Parts Part No 750 184 9 3 Insulated Front Head Model CB LE ...
Page 154: ...Chapter 9 Parts 9 4 Part No 750 184 Insulated Front Head Interior Model CB LE ...
Page 155: ...Chapter 9 Parts Part No 750 184 9 5 Insulated Inner Door Model CB OS ...
Page 156: ...Chapter 9 Parts 9 6 Part No 750 184 Insulated Rear Head CB LE ...
Page 157: ...Chapter 9 Parts Part No 750 184 9 7 Insulated Rear Head CB LE ...
Page 158: ...Chapter 9 Parts 9 8 Part No 750 184 Insulated Rear Head CB OS ...
Page 159: ...Chapter 9 Parts Part No 750 184 9 9 Dry Oven Model CB LE ...
Page 161: ...Chapter 9 Parts Part No 750 184 9 11 Motor Impeller Model CB LE ...
Page 162: ...Chapter 9 Parts 9 12 Part No 750 184 Front Head Linkage ...
Page 170: ...Chapter 9 Parts 9 20 Part No 750 184 Control Cabinet Hawk ICS ...
Page 171: ...Chapter 9 Parts Part No 750 184 9 21 Control Panel Standard ...
Page 172: ...Chapter 9 Parts 9 22 Part No 750 184 Entrance Box ...
Page 173: ...Chapter 9 Parts Part No 750 184 9 23 Front Head Electrical CB LE ...
Page 174: ...Chapter 9 Parts 9 24 Part No 750 184 Front Head Electrical CB LE ...
Page 175: ...Chapter 9 Parts Part No 750 184 9 25 Front Head Electrical CB OS ...
Page 176: ...Chapter 9 Parts 9 26 Part No 750 184 Front Head Electrical CB OS ...
Page 179: ...Chapter 9 Parts Part No 750 184 9 29 Heavy Oil Piping 60 Steam CB LE ...
Page 180: ...Chapter 9 Parts 9 30 Part No 750 184 Heavy Oil Piping 60 Steam CB LE SEE TABLE NEXT PAGE ...
Page 181: ...Chapter 9 Parts Part No 750 184 9 31 Common Oil Parts Heavy Oil ...
Page 182: ...Chapter 9 Parts 9 32 Part No 750 184 Side Mounted Air Compressor Piping ...
Page 183: ...Chapter 9 Parts Part No 750 184 9 33 Air Compressor Piping CB OS ...
Page 185: ...Chapter 9 Parts Part No 750 184 9 35 Light Oil Piping ...
Page 186: ...Chapter 9 Parts 9 36 Part No 750 184 Light Oil Air Piping Front Head ...
Page 187: ...Chapter 9 Parts Part No 750 184 9 37 Light Oil Air Piping Front Head PAGE 9 31 ...
Page 191: ...Chapter 9 Parts Part No 750 184 9 41 Gas Train 125 150 HP ...
Page 193: ...Chapter 9 Parts Part No 750 184 9 43 Gas Train 200 HP ...
Page 195: ...Chapter 9 Parts Part No 750 184 9 45 Steam Pressure Controls ...
Page 196: ...Chapter 9 Parts 9 46 Part No 750 184 Hot Water Temperature Controls ...
Page 197: ...Chapter 9 Parts Part No 750 184 9 47 Water Column ...
Page 198: ...Chapter 9 Parts 9 48 Part No 750 184 Water Column ...
Page 199: ...Chapter 9 Parts Part No 750 184 9 49 Fireside Gaskets CB LE ...
Page 200: ...Chapter 9 Parts 9 50 Part No 750 184 Fireside Gaskets CB OS ...