18
P1891E/EN 2014-02
1891b-enu_1_5_bedingt.fm, 25.04.2014
Before initial operation
5
5
Before initial operation
The 47BA has been pre-configured by
Cleco
. A setting for your specific screw joint needs must only be
made with the controller or a PC by a qualified person. For more information, refer to the programming man-
ual.
5.1
Use of reaction bar
5.2
Setting up tool holder
Mount the tool holder on a stable base.
For tool holder with IrDA interface port:
Select the location in such a way that no outside light shines onto the tool holder.
This can inhibit data transmission.
Lay the connection cable in such a way that there is no danger that persons can trip.
5.3
Ambient conditions
5.4
Charge battery pack
Battery pack is only partly charged upon delivery.
It must be fully charged before initial use. See battery pack instruction manual.
Only for LiveWire 2
Scanner
Order no. 937240PT
Top plate for platform
Order no. 937255PT
LMC
Order no. 961462PT
CAUTION!
Danger of hands being crushed.
Always use a reaction bar for applications in restricted space and
torques over 68 Nm.
Ambient temperature
0 °C (32 °F) to m40° C (+104° F)
Humidity
0 to 80 %, not with dew
Working height
up to 1000 m above sea level