37
English
English
Installation Instructions
Important:
Safety against backfl ow of the whirlpool in
compliance with EN 1717 / EN 61770
Installation example Fig. A
•
Safety against backfl ow by free outlet,
installation of a separate bath spout over
the tub rim
•
Safety against backfl ow of handshower by
check valve in wall outlet
Installation example Fig. B
•
Safety against backfl ow by iBox universal
+ bath-shower mixer with integrated safety
combination*
•
Installation height min. 280 mm midle of
iBox universal til top edge of bath rim
* Integrated safety combination =
1 check valve + 1 vacuum breaker in
series (in fl ow direction); check valve
additionally secures the hand shower
Installation example Fig. C
•
Safety against backfl ow by iBox universal
+ thermostatic mixer or single lever mixer
fi nish set and an external vacuum breaker
•
Installation height min. 200 mm lower
edge of air inlet opening of the vacuum
breaker til top edge of bath rim
•
Safety against backfl ow of handshower by
check valve in wall outlet
Installation example Fig. D
•
Safety against backfl ow by rim mounted
thermostatic bath mixer in combination
with Exafi ll and an external vacuum
breaker
•
Installation height min. 200 mm lower
edge of air inlet opening of the vacuum
breaker til top edge of bath rim
•
Safety against backfl ow of handshower
by check valve in the Secufl ex connection
(extractable handshower)
A
B
280 mm
C
200 mm
DN 15
(1/2“)
DN 15
(1/2“)
D
Summary of Contents for Luxusline Duo Imaza 750
Page 2: ...2...
Page 35: ...35 5 16 17 18 1 2 3 8 4 6 7 9 10 11 12 15 14 13 English English Equipment...
Page 75: ...75 97308000 English Service Replacement of rechargeable battery in the Poolkontrol...
Page 77: ...77 English Declaration of performance...
Page 78: ...78 Declaration of performance...