19
2.
Fill the pump tank with hydraulic oil about half tank. (AW 32, or 46 Non-Detergent
Non-Foaming Anti-Wear Hydraulic Oil SAE-10). Make sure the funnel used to fill is clean.
NOTE: Not fill up the tank at this moment.
STEP 6 ACCESSORY MOUNTING
1.
Insert the pin then assemble the access ramp. (Fig. 21,22)
2.
Put on the protection cover on the linking shaft.
Fig. 21
Fig. 22
STEP 7 POWER CONNECTING
1.
Have a certified electrician to run the 220V/60Hz single phase power supply to the control
box (Fig.15). Be sure to size the wire for a 25 amp circuit.
2.
Connect the compressed air ( 8 bar) to the inlet of the air-valve. ( Fig. 12)
STEP 8 TESTING
1.
Do not place any vehicle on the lift at this moment! Turn on the power switch.
2.
Open all three manual valves on the control unit. (Fig. 23)
3.
Press UP button to raise up the platforms totally. (Fig. 24)
Fig.23
Fig. 24
4.
Press DOWN button to lower down the platforms.
5.
Cycle the lift up and down several times by press the UP and DOWN buttons. (Each cycle
shall be with a break interval of about 1 minute.) If the oil in tank is not enough, add at
REV A-082913