20
times.
To insure that latch clicks all the way while rising up and all air is removed from the cylinder /
hydraulic system.
6.
Turn off the two angle valve on the control unit. ( Fig. 25)
Fig. 25
Fig. 26
7.
Cycle the lift up and down several times by press the UP and DOWN buttons again to check
the platforms are in level. (Each cycle shall be with a break interval of about 1 minute.)
If not, repeat above 2—5 procedures.
8.
Screw on the top position limit switch under
the edge of the base plate of left platform
(Fig. 26).
9.
Line up the hoses and cables. Put on the
hose fixing plate and cover to protect them
(Fig.27). Position the control unit. Anchored
these covers and control unit.
Fig.27
Now the lift is ready for operation.
REV A-082913