21
Now we are starting to assemble Polycarbonate panels and glazing bar.
1.
Sliding PC panel #B between cross bar part #V042 and side sill beam with PVC anti-dust strip P7 on bottom.
2.
Connect curved glazing bar #V743 with ridge and hanging basket bar, and tighten it.
3.
Inserting polycarbonate panel # I into the alu. Frame channel and curve it along the curved alu. Channel.
4.
You could squeeze PC panel up and down, and adjust the depth of inserting of cross bar part #V042 on horizontal rail.
Very Important:
2 pcs of #a1 bolts will need to be slid into each glazing bar for hanging basket bar & horizontal rail,
1 pc of #a8 bolt will need to be slid into each glazing bar for connecting side sill in advance, and has to be finger tight-
ened for later use. Please note: At this stage you will also need to insert an extra bolt into each glazing bar either side of
where the vent opening will be positioned. Decide now where your roof vents are positioned so that you can work out the
correct number of bolts in each glazing bar.
And slide the roof vent to assigned position from the Ridge immedi-
ately; otherwise roof vent will slide difficultly in case of extension ridge not connecting with front ridge smoothly.
V042
Hangi
ng bas
ket ba
r
Horizo
ntal ra
il
assembling cross bar part
#V042 on horizontal rail
PC panel bottom
with PVC anti-
dust strip P7
B
I
attach first
(not tighten)
V743
You should attach glazing bar #V743 with ridge
and hanging basket bar first (not tighten). So you
can still move it a little bit and insert the panel.
V743
012
Separate curved glazing bar #V743 a little from
bottom, and make an angle and then insert PC
panel into alu. Frame channel.
a1
a2
a1
a2
V743
breach
If you forgot sliding extra
bolts into glazing bar or
corner bar channels in
advance, please add it
through this breach.
5
5