2
Climapod Assembly Tips and Tricks
●
Prior to the assembly of the greenhouse, you should have a 10mm nut driver,
10mm open-end wrench, Phillips head and slotted screwdriver, spirit level,
ladder, needle nose pliers, flat head screwdriver, and some WD-40 lubricant.
●
Caulking Increases the structural integrity of the greenhouse and prevents
water from going into the panels. Caulking the top of the middle seam will pre-
vent algae and water buildup.
●
We recommended Henry 212 All Purpose Crystal Clear Sealant
●
The base has to be 100% level and square. The easiest way to ensure this is
to make sure that the two diagonal measurements are identical.
●
Erection of the greenhouse should only take place in calm and dry weather.
●
Pre-Assemble and caulk windows and doors before you erect the greenhouse
●
Pre thread aluminum profiles for window and door pieces to make assembly
easier
●
Keep bolts loose during assembly and avoid securely attaching (#40) before
the first panel arch has been inserted
●
It is far easier to assemble if you have an elevated surface such as two 4’×8’
pieces of plywood on a sawhorses.
Basic Steps to Assembly
1. Prepare Foundation
2. Attach and secure Base and side sills
3. Assemble and Caulk Windows and Doors
4. Assemble Gables
5. Attach Gables to base and side sills and connect with top ridge beam
6. Connect Hanging basket bar, horizontal rails, and partially connect #040
7. On one side begin by inserting B panel, then crossbar, then L1 Panel
8. Secure into place with curved aluminum profile.
9. Continue the process while alternating sides.
10. To fit final panels loosen bolts to partially disconnect front gable and allow for
more space
11. Slide in windows, if needed trim upper corners of arches
12. Install doors and additional accessories
13. Caulk top of outside midseam all around greenhouse