3
Supplementary Instructions
For additional questions or concerns please email
sales@climapod.com
or call
360.674.2642
Gather all parts
necessary for as-
sembling the top of
the gable.
Make sure to in-
sert Polycarbonate
pieces into Alumi-
num profiles be-
fore inserting bolts
into channels
Once bolts are in-
serted slightly
tighten nuts, at the
top, working down-
ward to position
and bolt the rest of
the gable.
The completed top of the gable should look like the image on the above.