7
Statement
Tips
1. The base has to be fastened in a non-freezing depth(80cm).
2. The greenhouse is to be fastened to the base.
3. The base has to be 100% level and square. The easiest way to ensure this is to make sure that the
two diagonal measurements are identical.
4. We recommend that you grease screws for doors and windows for easier assembly.
5. Erection of the greenhouse should only take place in calm and dry weather.
6. All frames are to be assembled around the polycarbonate as shown on the drawings. We recom-
mend that you start with the back gable.
7. IMPORTANT
Before assembling aluminum base, the end trough centers of four legs should match
both end trough centers of side sills and front & rear sills at the same time.
Remove approximately 2
inches of film from all
sheet edges before in-
stalling. Remove all film
immediately after the con-
structions is completed.
The UV-protected side of
the sheet is covered with
opal white film/text and
must face towards the
sun.
Please put on gloves
avoid slitting your hands.
Handle with care! Drop-
ping can bend the frame,
and it won’t fit properly.
Keep sharp instruments
away from the polycar-
bonate sheets.
Cautions
Foundation
The base is maintenance free and, of course all fittings are included. Remember to order concrete pipes
and concrete at your local dealer as these are not included in the delivery.
Please match four corner
troughs together at the
same time
side s
ills
front & rear
sills