60
C l i m a t e M a s t e r W a t e r- S o u r c e H e a t P u m p s
C L I M A T E M A S T E R W A T E R - S O U R C E H E A T P U M P S
Tr a n q u i l i t y
®
2 0 ( T S ) S e r i e s
R e v. : 0 6 / 1 7 / 1 5
Start-Up Log Sheet
Installer:
Complete unit and system checkout and follow unit start-up procedures in the IOM. Use this form to record
unit information, temperatures and pressures during start-up. Keep this form for future reference.
J
ob Name: ________________________________ Street Address: _____________________________________
Model Number: ____________________________ Serial Number: ______________________________________
Unit Location in Building: _______________________________________________________________________
Date: ________________________________ Sales Order No: __________________________________________
In order to minimize troubleshooting and costly system failures, complete the following checks and data entries before
the system is put into full operation.
Fan Motor: Speed Tap (PSC) or CFM Settings (ECM)
________________________
Temperatures:
F
or
C
Antifreeze:
_____%
Pressures: PSIG or kPa
Type __________________
Cooling Mode
Heating Mode
Entering Fluid Temperature
Leaving Fluid Temperature
Temperature Differential
Return-Air Temperature
DB
WB
DB
Supply-Air Temperature
DB
WB
DB
Temperature Differential
Water Coil Heat Exchanger
(Water Pressure IN)
Water Coil Heat Exchanger
(Water Pressure OUT)
Pressure Differential
Water Flow GPM
Compressor
Amps
Volts
Discharge Line Temperature
Motor
Amps
Volts
Allow unit to run 15 minutes in each mode before taking data.
Do not connect gauge lines