C L I M AT E M A S T E R WAT E R - S O U R C E H E AT P U M P S
TSM/TSL Vertical Stack
R e v. : J a n u a r y 1 8 , 2 0 2 1
C l i m a t e M a s t e r Wa t e r-S o u rc e H e a t P u m p s
32
Cabinet with “G” Panel Frame
Figure 11: Cabinet with “G” Panel Frame and Optional Outside Air Duct (Field Fabricated)
Outside Wall
Insulation
Field Supplied
Insulated
Ductwork
Field Supplied Grille with
Insect Screen
Field Supply
Flex Duct Collar
or Fabricate Extension.
Seal to Cabinet and Wall.
G Panel Frame
(Over Drywall)
Seal 4 Sides
Motorized Air Damper 48A0100N04
Assembled to Frame.
Connect Molex Wire Harness
to Chassis Control Box.
Cut Hole
in Stud
and Seal.
See IOM
with Kit for
Location
and Size.
Drywall
Supply Air
Grille Opening
A
Note
7
57-1/2
(1460) R.O.
5-7/8*
(149)
Floor
12-1/4
(311)
28-5/8
(727)
*If cabinet is on floor
Drywall opening for “G” frame
R.O.
FRONT VIEW
*
Models
Frame
A
For 09-12
For 15-18
48A0100N51
19 5/8
(498)
For 24-36
48A0100N52
24 3/8
(620)
Notes:
1. All units with outside air option must use motorized air damper. Damper to be closed when unit not operating.
2. Duct can be on right or left side.
3. On all installations, mixed return air to unit must be 45°F (7°C) to 95°F (35°C), and not exceed 20% of total CFM.
4. On all installations, the ambient temperature behind interior wall must be above freezing.
5. Prevent condensate on all installations of risers and loop piping insulate if required.
6. Frame attaches to studs, do not distort shim if required.
7. Cabinets with 1” (25) filter rack remove 2 side cabinet flanges, set back 4.75” (121) minimum; 2” (50) filter rack
set back 6.25” (159) minimum.
8. Seal 4 sides between frame and cabinet use foam, foil tape, caulk, or field fabricated sheet metal.
TOP VIEW
48A0100N50
16 5/8
(400)