M0G940E8-00 04/07/08
pag
52
Size 51
"G"
W4
W1
W2
W3
1
2
3
8
11
12
7
7
7
12
4
3
8
1
5
10
6
9
M
N
P
O
157
510
133
33
6
11
7
(13)
100
(1
3)
15
0
(13)
500
36
0
800
1
370
65
300
336
98
15
9
20
9
103.5
The units require minimum clearances for operation and maintenance. The following sketch describes the minimum clearances to be considered. In the event of multiple units, the
functional clearances must be doubled.
Size
51
M
mm 343
N
mm 167
O
mm 144
P
mm 192
Length mm
800
Depth mm
300
Height mm
1370
W1
kg 19
W2
kg 39
W3
kg 26
W4
kg 51
Operating weight
kg
135
Shipping weight
kg
137
(1) COMPRESSOR
(2) EXTERNAL EXCHANGER
(3) INTERNAL EXCHANGER
(4) ELECTRICAL PANEL
(5) WATER INLET 1" GAS
(6) WATER OUTLET 1" GAS
(7) HELICAL FANS
(8) PUMP
(9) WATER SIDE SAFETY VALVE
(10) POWER INPUT
(11) EXPANSION VESSEL
(12) CONDENSATE DISCHARGE
(13) CLEARANCE ACCESS RECOMMENDED
(G) BARYCENTRE
Summary of Contents for WSAN-XPR 21
Page 2: ......
Page 25: ...M0G940E8 00 04 07 08 pag 25...
Page 48: ...M0G940E8 00 04 07 08 pag 48...
Page 49: ...M0G940E8 00 04 07 08 pag 49 TECHNICAL DATA...
Page 59: ......