11
Test Procedures
TROUBLESHOOTING AND ELECTRICAL
SYSTEM: GASOLINE VEHICLES
TEST PROCEDURE 36 – Bed Lift Switch
1.
Remove the bed lift switch.
See Bed Lift Switch Removal on page 13-10.
2.
Check continuity between the terminals
of the switch and compare the readings
with the Bed Lift Switch Continuity Table. If continuity readings do not match the table, replace the switch.
See Bed Lift Switch Installation on page 13-10.
1
2
4
5
6
8
A
B
A. Up Position B. Down Position
Terminal:
1. #14 Black w2 2. #14 Red w3 4. #14 Red w7 5. #14
Red w7 6. #14 Yellow w5 8. #14 Black w2
2104
Figure 11-36
Bed Lift Switch Terminals
_
BED LIFT SWITCH CONTINUITY
Between
Terminals
1
2
4
5
6
8
1
Cont. when
pushed DOWN
2
Cont. when
pushed DOWN
Cont. when
pushed UP
4
Cont. when
pushed UP
5
Cont. when
pushed DOWN
6
Cont. when
pushed DOWN
Cont. when
pushed UP
8
Cont. when
pushed UP
TEST PROCEDURE 37 – Bed Lift Circuit Breaker
1.
Remove the bed lift circuit breaker.
See Bed Lift Circuit Breaker Removal on page 13-10.
2.
Place the red probe of the multimeter on the circuit breaker terminals. If the multimeter does not indicate
continuity, replace the circuit breaker.
See Bed Lift Circuit Breaker Installation on page 13-10.
Page 11-40
2016 Carryall 1500/1700 and XRT 1550 Maintenance and Service Manual
Summary of Contents for Carryall 1500 2016
Page 2: ......
Page 432: ...NOTES...
Page 433: ...NOTES...
Page 434: ...NOTES...
Page 435: ......
Page 436: ......