TROUBLESHOOTING AND ELECTRICAL SYSTEM:
GASOLINE VEHICLES
Test Procedures
11
TEST PROCEDURE 36 – Bed Lift Switch
1.
Remove the bed lift switch.
See Bed Lift Switch Removal on page 13-10.
2.
Check continuity between the terminals
of the switch and compare the readings
with the Bed Lift Switch Continuity Table. If continuity readings do not match the table, replace the switch.
See Bed Lift Switch Installation on page 13-10.
1
2
4
5
6
8
A
B
A. Up Position B. Down Position
Terminal:
1. #14 Black w2 2. #14 Red w3 4. #14 Red w7 5. #14
Red w7 6. #14 Yellow w5 8. #14 Black w2
2104
Figure 11-35
Bed Lift Switch Terminals
BED LIFT SWITCH CONTINUITY
Between
Terminals
1
2
4
5
6
8
1
Cont. when
pushed DOWN
2
Cont. when
pushed DOWN
Cont. when
pushed UP
4
Cont. when
pushed UP
5
Cont. when
pushed DOWN
6
Cont. when
pushed DOWN
Cont. when
pushed UP
8
Cont. when
pushed UP
TEST PROCEDURE 37 – Bed Lift Circuit Breaker
1.
Remove the bed lift circuit breaker.
See Bed Lift Circuit Breaker Removal on page 13-10.
2.
Place the red probe of the multimeter on the circuit breaker terminals. If the multimeter does not indicate
continuity, replace the circuit breaker.
See Bed Lift Circuit Breaker Installation on page 13-10.
2013 Carryall 295/XRT 1550 Maintenance and Service Manual
Page 11-37
Summary of Contents for Carryall XRT 1550
Page 2: ......
Page 28: ......
Page 40: ......
Page 62: ......
Page 106: ......
Page 120: ......
Page 180: ......
Page 224: ......
Page 272: ......
Page 310: ......
Page 344: ......
Page 362: ......
Page 370: ......
Page 418: ...NOTES...
Page 428: ...NOTES...
Page 430: ...NOTES...
Page 431: ......
Page 432: ......