ELECTRICAL COMPONENTS (GASOLINE
VEHICLE)
Starter/Generator
20
STARTER/GENERATOR REWORK
Any rework must be performed by a qualified technician. Starter/generator service specifications are listed in
the following table.
ITEM
SERVICE LIMIT
Commutator diameter (minimum)
1.60 in. (41 mm)
Concentric with armature shaft within
0.002 in. (0.051 mm)
Minimum commutator diameter for reslotting
1.65 in. (42 mm)
Undercut (Commutator must have a minimum diameter of 1.65 in (42 mm) for
reslotting):
0.050 in. (1.3 mm)
Dielectric strength
500 VAC for one minute
Armature insulation resistance
0.2M (ohms) at 500 VDC
Starter field coil resistance
0.006 to 0.01 ohms
Generator field coil resistance
4.5 to 5.5 ohms
STARTER/GENERATOR ASSEMBLY
1.
Slide the bearing retainer (32) onto the output end of the armature shaft (33)
.
2.
Press a new ball bearing (35) onto the output end of the armature
. Press a new ball
bearing onto the commutator end of the armature shaft.
See following CAUTION.
CAUTION
• To prevent damage to the retainer, use care while pressing new bearing onto the output end of the
shaft.
• Press against the inner race of the new bearing until it is fully seated.
3.
Install the drive end cover (36) onto the armature. Secure the bearing retainer ring (32)
.
4.
Slide the housing with field coils over the armature. Use the tapped mounting holes to align housing to the
cover, rotate and orient as shown.
NOTE:
The terminal insulators should be on the commutator end of the housing.
5.
To prevent contact between the brushes and commutator as the commutator cover is installed, and possible
damage to the brushes, lift the brush springs out of the notches in the brushes and pull the brushes back from the
center of the commutator end cover. The springs will rest on the sides of the brushes and help prevent them
from sliding towards the center of the cover
.
6.
Install the commutator end cover (23) onto the armature shaft. Use the tapped mounting holes to align housing
to the cover, rotate and orient as shown. Install the two M6 x 180 mm bolts (20), and tighten to 60 in·lb (6.8
N·m)
7.
Push the brushes down into the holders. Place springs into the notches in the brushes. Install the brush cover
(30) that has the drain hole in it next to the A2 terminal. Install the remaining three brush covers (29) in the
openings in the commutator end cover (23)
8.
Install the belt pulley (39) onto the shaft, and install the lock washer (40) and M14 nut (41). Tighten the nut to 30
ft·lb (40.7 N·m)
9.
Install the A1 to F1 terminal jumper wire on the starter/generator.
9.1. Loosely attach wire, flat washers, lock washers and nuts onto each terminal.
2014 Precedent
®
Golf Car Maintenance and Service Manual
Page 20-9
Summary of Contents for Precedent 2014
Page 2: ......
Page 4: ......
Page 24: ......
Page 28: ......
Page 38: ......
Page 66: ......
Page 104: ......
Page 116: ......
Page 152: ......
Page 234: ......
Page 252: ......
Page 264: ......
Page 298: ......
Page 332: ......
Page 394: ......
Page 412: ......
Page 438: ......
Page 444: ......
Page 508: ......
Page 534: ......
Page 543: ......
Page 544: ......
Page 545: ......
Page 547: ......
Page 548: ......