20
Section
Regulation
Re-mark
Airend Temp.
Max. 176℉(@Airend)
Amb. Temp.
32~104℉
Lamp on during the operation
Sart
Input voltage
±10% of rated voltage
Pressure gap of unit and discharge
Max. 7.25 psi
5-2-2 Start-Up
1) Check if the tank pressure is 0 psi.
2) Check if the monitor indicates a normal condition for the operation, and then push the “RUN” button.
3) Fully open the valve on the discharge side before starting the compressor.
4) Check if there is any abnormal noise, and the operation is in good condition.
5-2-3 During the Operation
1) With a full load, check the values indicated by the instruments. Also check if the indicator lamps are
normally on in the control panel.
2) Pull the ring on the safety valve every 500 hours to check if the operation is normal.
[ Table 5-2 ] Checklists During the Operation
1) Push the “STOP” button.
2) Turn the main power off.
3) Check if the internal pressure is completely discharged from the compressor.
5-2-4 Stop
Regularly record the information about the operation events in the operation log to early find the failure
of the compressor and to prevent the accident before happens. The information includes the discharge
pressure, operating time, maintenance items and the time to replace the parts. There is a sample
operation log attached in the user’s manual.
5-2-5 Operation Log
1) It is extremely hazardous to disassemble the valves or pipes from the compressor system during
the operation.
2) Always check if the pressure is 0 psi in the tank before disconnecting the valves or pipes.
3) Since the tank is still hot for a certain time even after the operation is stopped, there is a danger
of burns if you are not careful.
4)
The rotating parts in the compressor is extremely dangerous during the operation.
Do not come near the parts until the compressor is stopped and the main power is turned off.
Warning
OPERATION