background image

( 1 )

FAX NO.

(904) 641-1697

Coastal Industries Inc.

P.O BOX 16091

JACKSONVILLE, FLORIDA 32246

TELEPHONE NO.

(904) 642-3970

Paragon

NEO ANGLE  w/Bi-fold

PARA_NEO_BIFOLD_12/23/99

Summary of Contents for Paragon NEO ANGLE w/Bi-fold

Page 1: ... 1 FAX NO 904 641 1697 Coastal Industries Inc P O BOX 16091 JACKSONVILLE FLORIDA 32246 TELEPHONE NO 904 642 3970 Paragon NEO ANGLE w Bi fold PARA_NEO_BIFOLD_12 23 99 ...

Page 2: ...l not shown g11 98 42 Magnetic Strip not shown 1 g12 6 8114FHP Door Panel Assembly Screws 8 H DRIP RAIL ASSEMBLY 2 h1 2340 Drip Rail 1 h2 C176G Vinyl Sweep 1 h3 4403 Drip Rail Tape installed 1 I MAGNET HOLDER ASSEMBLY i1 942 Magnet Holder 1 i2 98 44 Magnet 1 J CP930 DOOR HANDLES set 1 K 6114MSFHP DOOR HANDLE SCREWS 2 L 83212SS SET SCREW 2 M SP189B BUSHING 3 4 x 3 8 O D 2 N 81MSFHP BUSHING SCREW 2 ...

Page 3: ... 3 Paragon Neo Angle Bi Fold exploded view PARA_NEO_BIFOLD_12 23 99 ...

Page 4: ...Curb Assemble Sill A by inserting Corner Brackets R into Sill pieces and bringing the pieces together see figure above and exploded view sheet 3 Using the Corner Bracket holes as guides mark and drill the Sill pieces with a 1 8 drill bit Secure the Corner Brackets to the Sill pieces with eight 8 6 x 1 4 machine screws S Now run a bead of caulking on inside of crevice where Sill pieces join to insu...

Page 5: ...AKAGE SLIDE GLASS PANELS AWAY FROM WALL JAMBS BEFORE DRILLING HEADER Trim top bottom Dam Strips Measure the door opening width at Sill and Header levels Trim top and bottom Guide Tracks C to measurements obtained With high lips toward exterior position Guide Tracks on the Header and Sill and snap them into place Insert Glazin Vinyls Insert Vertical and Horizontal Glazing Vinyl V W to secure the Gl...

Page 6: ...orner Post E from which it is to swing see figure and exploded view sheet 3 Remember that regardless of whether the door strikes on the left side or the on the right side the Door Assembly must always fold in toward interior of shower enclosure Temporarily leave as is Adjust Door Assembly Step inside the shower enclosure and close the Door Adjust Door Assembly G and Strike Post F as needed for pro...

Page 7: ... see figure below Align and bring together the magnet faces of pieces Z I as shown in figure Remove backing from tape z2 step inside the shower enclosure and close the Door Assembly Apply pressure on magnet holder to activate tape adhesion to Sill Finish by running a 638PHPT screw thru metals as shown in figure Leak Proof Your Installation Run a bead of clear mildew resistant caulking down the ful...

Page 8: ... 8 ...

Reviews: