General Description
Unpacking and Installation
1.
After opening Grinder’s package, make sure that the grinder is intact
and that there is no visible damage. If there is any doubt, DO NOT continue
the installation procedure and contact your local dealer for further assistance.
2.
Unpack the product carefully. For your convenience we suggest storing
all packaging materials where they can be used in the future, whenever the
Grinder’s transportation is necessary.
3.
Place the grinder on a stable flat counter in a dry area away from water
or water splashes.
4.
Open hopper’s beans lid and visually inspect that there are no foreign
objects of any kind remove any foreign object accordingly.
5. Install the hopper lid‘s handle with the provided screws and screwdriver.
Make sure to tight the screws so they cannot fall into the grinding
chamber.
6.
Install the grinder’s powder residue tray.
7.
Before plugging in the electrical cord, make sure:
a)
The Grinder voltage and frequency rating is the same as the supply
mains.
b)
The wall socket is fitted with an efficient ground contact.
c)
DO NOT plug the Grinder into the supply mains if a ground system is
not available in mains socket, socket should in compliance with national/local
electrical codes.
d)
IT IS COMPULSORY TO GROUND THE GRINDER. The manufacturer
cannot be held responsible if this obligatory requirement was not complied.
Main switch
Grinding dial
Coffee powder outlet
chute
Residue tray
Bean hopper lid
Grinder’s body
Over-load
protector
cover
Warning: All technical handling operations such as installation,
maintenance, or service should be performed by certified personnel
or by your local dealer.
Coffee Laboratory 589 Rappahannock Drive White Stone Va 22578 TEL (804) 435-5522 www.coffeelabequipment.com