BEAN TO CUP
CONNECTING THE WATER SERVICES
Refer to the current requirements of The Model Water Bylaws 1986
Statutory Instrument (SI) No.1147.
8.
The water supply should be taken from a 15mm rising main at a pressure of between 1 to 8
bar and should be fitted with a stopcock to isolate the supply during servicing. A 15mm
double backcheck valve, with inspection port, should be fitted to the flexible hose.
9.
The outlet should be fitted with BSP connections and must be positioned within 1.5m of the
machine to ensure correct fitting of the hose. If possible, the outlet should be located behind
the machine to prevent misuse.
10.
Before connecting the machine hose to the mains outlet, flush the system, via the stopcock,
to remove any impurities that may have accumulated in the mains supply pipe.
11.
Connect the machine hose to the mains outlet using the seals supplied and ensure that all
fittings are tight. Turn on the water supply at the stopcock and check for leaks, both behind
and inside the machine.
Summary of Contents for BEAN TO CUP
Page 1: ...BEAN TO CUP BEVERAGE MACHINE TECHNICAL MANUAL ...
Page 5: ...COFFEtek LTD 5 01 12 2005 Issue 1 BEAN TO CUP This page is intentionally blank ...
Page 14: ......
Page 43: ...COFFEtek LTD BEAN TO CUP Issue 1 01 12 2005 42 Section 4 Exploded Parts Diagram ...
Page 44: ... wittern 88734_btc_but_6 dgn 27 01 2009 11 51 10 ...
Page 45: ......
Page 46: ......
Page 47: ......