9
3. Installation Con’t.
1. Remove the reservoir cap
n
2
2. Pour steam-process distilled water into
the reservoir until almost full (a maximum
of 4L). Use a funnel to avoid spillage.
3. Replace and secure the cap.
3.5 Priming the Statim Pump
To prime the Statim pump,
follow these steps:
1. Move the unit to the edge of the work
surface. The front leveler feet should be
approximately 12 mm from the edge.
2. Lift the front left corner of the unit upward and remove the drain tube
n
3
from
the clip located on the underside of the unit.
3. Pull the drain tube outward so the free end can be positioned over a water container.
4. Fill the reservoir with steam-process distilled water.
5. Remove the plug
n
4
from the end of the drain tube and allow water to drain from the tube
into a container for 30 seconds. When the water flows in a steady stream, replace the
stopper.
6. Lift the front left corner of the unit upward and reinsert
the tube into the clip on the underside of the unit.
Push the excess length of tubing back into the space
provided.
Make sure the plug in the drain tube is secured.
3.6 Setting the Time and Date
To set the time and date, follow these steps and watch the blinking cursor on the LCD:
1. Power the Statim OFF.
2. Press and hold the UNWRAPPED cycle button.
3. While pressing the UNWRAPPED cycle button,
power the Statim ON. The LCD display reads:
4. Use the cycle buttons to select and change the selected field’s value. To increase a
field’s value, press the UNWRAPPED cycle button. Hold the button down to increase the
value.
5. To decrease the value, press the WRAPPED cycle button.
n
2
Figure 5
Figure 6
n
3
n
4
14:23
11/15/2006
HH:MM
DD/MM/YYYY
Display when setting the Date / Time