InteliMains
NT
, SW version 3.2.0
InteliMains-NT-MCB-MGCB-3.2.0-Reference Guide.pdf,
©ComAp – April 2015
71
The level is illustrated by the green dashed line. If the load reserve keeps insufficient for longer time
than defined by the setpoint
Pwr management:
#NextStrt del
, the next gen-set is actually started.
The standard starting sequence follows. Please refer to the chapter Engine states for further
information. Once the synchronization procedure is done, the GCB breaker is closed and the gen-set
power is ramping up. Once loaded, the system load reserve is raised and becomes sufficient again.
Please note the sum of nominal power of all gen-sets on the bus is increased by the nominal power of
the additional gen-set.