INSTALLATION GUIDE FOR UHF DAS
ENU STATUS : 1-0-0
Copyright - refer to title page
Page 23
3.3
INSTALLATION PROCEDURES
3.3.1
GOODS INWARDS INSPECTION
⚫
Verify the number of packages received against the packing list.
⚫
Check all packages for external damage; report any external damage to the shipping courier. If there is damage, a
shipping agent should be present before unpacking and inspecting the contents because damage during transit is
the responsibility of the agent.
⚫
Open and check each package against the packing list. If any items are missing, contact Comba.
⚫
Do not remove items from anti-static packing until ready for installation. If damage is discovered at the time of
installation, contact the shipping agent.
3.3.2
TOOLS
See Appendix A for a full list of the recommended tools required for installation and routine maintenance.
3.3.3
PREPARATION
⚫
Wall mounting with the masonry bolts supplied, which make use of the outer holes.
8
14
Figure 11: Mounting Rack Overview
3.3.4
WALL MOUNTING FOR MU AND RU
⚫
Drill four holes on the wall using the position of four holes on the mounting rack as a guide. Fix the mounting rack
to the wall using four masonry bolts (M10x110mm).