INSTALLATION GUIDE FOR SR-1910
SR-1910 QI
Copyright - refer to title page
Page 21
ENU Status : 1-1-1
3.3 INSTALLATION PROCEDURES
3.3.1 GOODS INWARDS INSPECTION
z
Verify the number of packages received against the packing list.
z
Check all packages for external damage; report any external damage to the shipping courier. If there
is damage, a shipping agent should be present before unpacking and inspecting the contents
because damage during transit is the responsibility of the agent.
z
Open and check each package against the packing list. If any items are missing, contact Comba.
z
Do not remove items from anti-static packing until ready for installation. If damage is discovered at the
time of installation, contact the shipping agent.
3.3.2 TOOLS
See Appendix A for a full list of the recommended tools required for installation and routine maintenance.
3.3.3 MOUNTING ARRANGEMENT
The mounting arrangement of the SR-1910 is designed for wall mounting. The figure below shows the
location of the holes for the mounting tabs.
307
270
Figure 6: Wall mounting overview