USER MANUAL FOR MBDA-200S
ENU STATUS : 1-0-0
Copyright - refer to title page
Page 30
4.3 COMMISSIONING PROCEDURE
System commissioning can commence after the monitoring system has completed self initialization. The
commissioning procedure is shown below:
Connect and inquiry status
Set channel No.
Input power detection and adjust the direction of
Donor Antenna
Output power confirmation
Drive test and adjust the direction of Service
Antenna
Adjust UL ATT and confirm the call quality
Double check the status of BTS Uplink and the isolation
between Donor Antenna and Service Antenna
End
Set monitor parameters
Isolation detection
Figure 24: Commissiong Flow Chart