Omega II
®
Installation, Operation & Maintenance
Combustion Research Corporation
Page 9
COMBUSTION TUBE INSTALLATION
The first section or radiant tube downstream of the burner is
a heavy wall 16 Ga. heat-treated aluminized steel tube.
This tube is referred to as the combustion tube. One end of
this tube is swaged to fit inside the next spiral radiant tube.
The end that is un-swaged is coupled to the burner
assembly – see page 9. It is necessary that the weld seam
on this combustion tube be positioned so that it is on the
bottom when installed.
This applies for both straight tube and “U” tube systems.
When the systems are mounted on a 30° angle the weld
seam should always be on the bottom.
TUBE & REFLECTOR HANGING METHODS
The
Omega II
®
system reflectors can be suspended
horizontally or at a 30° angle. The combination hanger is
designed so that the reflector angle will be horizontal when
suspended from the top loop or at a 30° angle when
suspended from the offset loop – see the illustration below.
The panel hangers may also be suspended horizontally or
at a 30° angle – see illustration below.
CUSTOMIZING SYSTEMS
A maximum of two 90° or four 45° elbows may be installed
after THE SECOND tube. The tube couplers that have
been factory installed will have to be removed to
accommodate the installation of any elbows. Any additional
elbows, radiant tube and reflector is optional equipment.
DO NOT INSTALL OR JAM TURBULATORS IN ELBOWS
OR "U" BENDS. CONSULT YOUR REPRESENTATIVE
OR THE FACTORY FOR PROPER INSTALLATION &
GUIDANCE.
Reflector Elbow
Secure To Connecting Reflector
With Sheet Metal Screws
Horizontal Mounting With
“Combination” Hanger
30° Mounting With
“Combination” Hanger
Horizontal Mounting With
“Panel” Hanger
30° Mounting With “Panel”
Hanger
Install Combustion Tube
with Weld Seam On Bottom
! IMPORTANT !
Summary of Contents for Omega II
Page 40: ...Omega II Installation Operation Maintenance Page 36 Combustion Research Corporation...
Page 48: ......
Page 49: ......