34
the packing (holding the special handles to extract it
from the top of the packing) and the optional battery.
After moving the machine away from all the packing,
start mounting the accessories and the batteries as per
the instructions provided in the specific section.
Keep all the pieces of the packing since they might be
useful in the future to protect the machine and the
accessories during transport to another location or
to authorized service centers. If not, the packing can
be disposed in accordance with current disposal laws.
4.4 UNBLOCKING THE ELECTROMECHANICAL BRA-
KE
•
When the machine is switched off or without
batteries the electromechanical brake is blocking
the machine and it is not possible to move it.
To unblock the electromechanical brake it is necessary
to operate on the traction motor in the front
wheel ( Photo M1 - 2 ) following the procedure
mentioned here below:
- Screw the pin ( Photo M2 - 2 ) and the unblocking
lever ( Photo M2 - 1 ) in the fork seating ( Photo M1
- 1 )
- Pull the pin outwards ( Photo M3 )
- Rotate the lever towards the motor ( Photo M4 )
- Block the lever on the motor in order that the fork
lever ( Photo M1 - 1 ) will be fixed in the outer position
( Photo M5 ).
Once the machine have been moved, it is necessary
to carry out the same procedure on the contrary
in order to replace the fork lever in the
machine working position ( Photo M1 - 1 ).
Remove the pin and lever
•
WARNING: Before using the machine be sure
that the fork lever is in the machine working
position ( Photo M1 - 1 ).
4.5 LIFTING AND TRANSPORT: MACHINE, BATTERY
AND BATTERY CHARGER
•
Never use a forklift truck to lift the machine. There
are no places on the frame that can be used to lift the
machine directly.
Before preparing the packing and transporting the
machine:
- Empty the recovery tank and the detergent solution
tank.
- Disassemble the squeegee and the brushes or scra-
pers.
- Disconnect and remove the batteries.
Place the machine on the original pallet (or an equiva-
lent one that can bear the weight and is big enough
for the machine’s overall dimensions) using an inclined
surface.
Solidly anchor the machine and the squeegee to the
pallet using metallic brackets or other elements that
can bear the weight of the parts.
Lift the pallet with the machine and load it on the
transport vehicle.
Secure the machine and the pallet using ropes conne-
cted to the transport vehicle.
As an alternative, when using private transport vehic-
les, use inclined ramps to push the machine without
the pallet, making sure to protect all parts and the
machine itself against violent impacts, humidity, vib-
rations and accidental movements during transport.
The battery boxes have holes where tools can be ho-
oked for handling.
☞
To lift or insert the battery (into the machine com-
partment), use only suitable personnel and equipment
(cables, eyehooks, etc.) for the operation and to bear
the weight of the loads involved. When transporting,
take the same precautions and follow the same instru-
ctions provided for the machine together with those
in the special manufacturer’s manual.
The battery charger can be transported on its sup-
ports, both vertically and horizontally. Take the same
precautions and follow the same instructions provided
for the machine together with those in the special ma-
nufacturer’s manual.
.
5. TECNICAL INFORMATION
5.1
5.1.1
5.1.2 BATTERIA
Regardless of the type of construction, battery perfor-
mances are indicated with the term capacity, which
always refers to a discharge period. Another important
value is the number of possible discharges. The capa-
city is expressed in amps per hour (Ah), while the dis-
charge period is generally indicated as 20 hours (C20
or 20h, or not expressly indicated) or 5 hours (C5 or
5h). The discharge/charge cycles indicate the number
of times that the battery can hold a charge under the
best conditions, i.e. they indicate the useful battery
service life complying with all the necessary measures.
Therefore, the capacity of a battery varies depending
on how fast it uses energy (current). That’s why there’s
such a variation in the capacity values expressed as C5
or C20. These factors must be taken into account when
comparing products available on the market with our
own.
This machine can be equipped with two types of bat-
teries that differ in terms of their construction and
features.
- Pb-Acid battery with tubular armored modules: the
electrolyte level in each element must be periodically
checked!
•
If one element is no longer covered by the acid
solution it will oxidize in 24 hours, thus perma-
Summary of Contents for CRS 90 BT
Page 3: ...3 1 2 A B 2 8 7 6 4 1 3 3 7 4 5 6 8 10 9 5...
Page 4: ...4 C D 3 2 4 1 1 2 3...
Page 5: ...5 E 2 1 3 F 2 14 12 7 9 10 11 1 3 6 16 8 15 13 4 5...
Page 6: ...6 3 3 2 1 4 6 7 6 7 1 2 5 1 G H...
Page 7: ...7 4 3 2 5 6 8 L 1 2 I 1 7 9...
Page 8: ...8 1 1 2 M1 M2 M3 2 M4 M5...
Page 93: ...97 8...
Page 94: ...98 7 3 12...
Page 95: ...99 6...
Page 96: ...100 5 2 10...
Page 97: ...101 4 4 35 10 50 30 95...
Page 98: ...102 3 5 1 CE CE 2 1 2...
Page 99: ...103 2 3 1 CE 4 1...
Page 100: ...104 1 1 1 1 1 2...
Page 102: ...106 2 2 1 2 2 2 10 2 3 2 4...
Page 103: ...107 2 5 3 3 1 4 35 C 10 50 C 30 95 2 10...
Page 104: ...108 3 2 4 4 1 4 2 4 3...
Page 105: ...109 4 4 M1 2 M2 2 M2 1 M1 1 3 4 5 M1 1 M1 1 4 5 5 5 1 2...
Page 106: ...110 20 20 20h 5 5 5h 5 20 24 5 1 3 5 2 5 2 1 A 1 2 3 4 5 6 7 8 9 10 B 1 2 3 4 5 6 7 8 C...
Page 108: ...112 6 2 90 Anderson An derson 0 6 3 2...
Page 109: ...113 7 7 1 7 2 7 2 1 G 3 G 3 G 5 7 2 2 G 5 G 3 7 2 3 7 2 2 G 6 G 6 7 2 4 G 4...
Page 110: ...114 G 2 45 G 4 G 2 7 2 5 7 3 0 1 1 0 7 4 50 C 7...
Page 111: ...115 B 5 Q 3 7 5 O 1 7 6 7 7 7 8 7 8 1 7 8 2...
Page 112: ...116 7 8 3 2 7 8 4...
Page 113: ...117 7 8 3 2 7 8 5 7 4 7 5 7 4 7 5 8 8 1 50 8 2 8 3...
Page 114: ...118 8 4 8 5 8 6 8 7 8 7 1 8 7 2 8 8 8 9 8 10 9 9 1 9...
Page 115: ...119 L 5 9 2 9 2 1 1 30 9 2 2 5 8 9 X X X X X X X X X X X X X X X X X...
Page 116: ...120 9 1 01 02 03 04 05 06 07 _ 08 09 10 11...
Page 117: ...121 9 2 3 9 2 4 9 2 5 9 2 6 9 2 7 9 2 8 9 2 9 9 2 10 100 20 30...
Page 118: ...122 10 12 10 1 2013 56 EU 10 2 2012 19 EU 2012 19 EU...
Page 137: ......
Page 138: ......