Technical Dept. Ref. IOM - PIST

ON (LIFT

 DISC) CHECK V

AL

VES, UNIFLOW® 3P-35 - Ed.18/02

Comeval V

alve Systems reserves the right to alter any technical data contained in this Manual without prior notice. Regularly updated data on www

.comeval.es

IOM - PISTON (LIFT DISC) CHECK VALVES, UNIFLOW® 3P-35

Page 5

ATTENTION!

- The filling, warming-up and starting-up of the system shall be gradual so as to avoid any inadmissible stress. Check 

for tightness in valve connections and body/cover union, and retighten crosswise and gradually if necessary until 

leakage elimination. If leakage persists surfaces should be thoroughly cleaned and new gaskets correctly placed.

- Ensure valve surface is in good condition and retouch coating protection if any when needed.

- In case of risk of media freezing inside the valve, take due measures to avoid it.

7. CARE AND MAINTENANCE

The operator must define maintenance and maintenance-intervals to meet requirements.

- Check for body, seat and connections tightness.

ATTENTION!

- Before disassembling the valve, note chapters 3, 10 & 12.

- There is a crushing hazard between the disc and seat. Ensure the disc is in rest position in case a hand is intro-

duced inside the valve.

- Only carry out maintenance work in the pipework when the valve has been secured from operation.

- Check the valve surface inside and outside and retouch coating protection if any when needed. If advanced 

corrosion or erosion is observed, double check service and valve features and replace the valve properly.

- In case of body/cover leakage, dismount the cover, remove old gasket, clean sealing surfaces and use a new gasket.

- In case of seat leakage, remove the valve cover to clean the seating surfaces or grind them if necessary. Discard 

any jamming on the disc movement. When mounting the cover again use always new gasket, and tighten the cover 

bolts evenly crosswise with moderate and uniform torque. Retighten them if leakage is detected under pressure. 

- If it is not possible to repair the damages replace the valve and contact us for assistance.

After any maintenance work please refer to chapters 5 and 6 for installation / commissioning.

Recommended Spare parts:

Use only original spare parts.

It is advisable to keep body/cover gaskets as spare parts. Type and number of each spare part to be stored according to 

many factors: service level, valves quantity, etc. In many cases a good choice is to keep complete valves as spare part.

8. TROUBLESHOOTING

In the event of malfunction or faulty operating performance, check that the installation and adjustment work has been ca

-

rried out and completed in accordance with this Manual.

ATTENTION!  

- It is essential that the safety regulations are observed when identifying faults.

9. TROUBLESHOOTING TABLE

ATTENTION!

- Read the complete Manual before carrying out installation and repair work.

- Read chapter 6 before recommissioning

.

FAULT

POSSIBLE CAUSE

CORRECTING MEASURES

No flow

Not enough flow

Flange covers or protection not removed Clear valve entrances

Improper installation position

Follow the arrow in the body

Piping clogged

Check piping system

Not enough pressure or flow

Check working parameters

Plug guiding system blocked

Check and try to unblock

Broken flange

Bolts not properly tightened

Re-align piping and fit new valve

Mating flanges not properly aligned

Valve not closing with reverse flow

Improper installation position

Check installation position

Disc surface or seat damaged

Check valve components

Low pressure

Check the system

Broken spring

Replace the spring

Plug guiding system blocked

Check and try to unblock

Disc stick

Fine vacuum service

Use a degassing connection

Leakeage between body and cover Cover bolts loose or gasket damaged

Retighten or change gasket

Technical support always available through our website www.comeval.es or your local distributor.

Summary of Contents for UNIFLOW 3P

Page 1: ...SIBLE DANGERS 2 2 1 Significance of symbols 2 2 2 Explanatory notes on safety information 2 3 PRESERVATION STORAGE HANDLING AND TRANSPORT 2 4 DESCRIPTION 2 4 1 General Description Operating principles 2 4 2 Area of Application 2 4 3 Technical data remarks 2 4 4 Marking nameplate 3 4 5 CE marking 3 5 INSTALLATION 3 5 1 General remarks on installation 3 5 2 Requirements at the place of installation ...

Page 2: ...with Data Sheet and product marking must also be observed and complied with for safely using the product 3 PRESERVATION STORAGE HANDLING AND TRANSPORT ATTENTION Protect against external force impacts vibrations etc Allow only skilled personnel suitable handling and lifting equipment must be used Always use suitable protection equipment and minimize the use of human body force at any step to avoid ...

Page 3: ...r performance Observe all applicable safety measures during installation Remove flange covers or any other remaining packing storage protection if present Lay pipelines such that damaging transverse bending and torsional forces are avoided Protect valves from dirt during construction work The interior of the valve and the pipeline must be free of foreign particles Protect the valve soft parts from...

Page 4: ...quirements at the place of installation Downstream from a disruptive element pump valve elbow pipe reduction leave as much distance as possible mini mum distance recommended 6 times the valve diameter 6xDN Upstream from a disruptive element leave at least a distance of 2xDN Aggressive environmental conditions may reduce the life span of the product Consider special construction protective measures...

Page 5: ...asket and tighten the cover bolts evenly crosswise with moderate and uniform torque Retighten them if leakage is detected under pressure If it is not possible to repair the damages replace the valve and contact us for assistance After any maintenance work please refer to chapters 5 and 6 for installation commissioning Recommended Spare parts Use only original spare parts It is advisable to keep bo...

Page 6: ...ecified in the General Sales Terms of COMEVAL VALVE SYSTEMS valid at the time of delivery or by way of departure in the contract of sale itself We guarantee freedom of faults in compliance with state of the art technology and the confirmed application No warranty claims are accepted for any damage caused as the result of incorrect handling or disregard of this Manual Data Sheet and relevant regula...

Page 7: ...al data contained in this Manual without prior notice Regularly updated data on www comeval es IOM PISTON LIFT DISC CHECK VALVES UNIFLOW 3P 35 Page 7 13 PARTS LIST Nº PART 1 Body 2 Disc 3 Bushing 4 Cover 5 Eye bolt 6 Cover gasket 7 Cover bolt 8 Cover nut 9 Spring option Detailed view with spring option recomended for size 6 and for vertical pipeline UNIFLOW 3P ...

Page 8: ...ny technical data contained in this Manual without prior notice Regularly updated data on www comeval es IOM PISTON LIFT DISC CHECK VALVES UNIFLOW 3P 35 Page 8 14 ANNEXES 14 1 Declaration of Conformity DC20_07EN 14 2 Data Sheet DS20 Updated documents on www comeval es Nº PART 01 Body 02 Disc 04 Cover 06 Cover gasket 08 Cover bolt 09 Spring UNIFLOW 35 ...

Reviews: