Transport, unpacking the UPS
Check carefully whether the carton and the contents are not damaged. If any damage is found,
immediately inform the shipping company and the power supply distributor.
Do not throw away the UPS packaging.
1.
If no damage is found, carefully open the carton.
2.
Unpack all protective elements (sponges, fillers).
3.
Gently remove the UPS from the protective film and place it on a clean, flat and stable surface.
To prevent mechanical damage, shock and impact, only transport the UPS in its original
packaging.
All models of the CORE 6K and 10K power supplies are suitable for both horizontal and vertical
mounting.
2.1.
Horizontal assembly in the Rack 19 '' cabinet
The CORE series power supply can be mounted in a Rack 19 '' housing. The following space is required
for installation:
•
for a UPS of 2U height and depth greater than 60 cm,
•
for a 3U high battery module and depth greater than 60 cm.
Each element requires the use of brackets for mounting in a rack.
You can also use the so-
called rails. Rail Kit 19 ”
- available as optional equipment.
For proper installation:
Step 1
Step 2