COVER series MZ – User manual
COMEX S.A.
22
Figure 4-2 Locating power switches in the MZ 60K power supply
Figure 4-3 Locating power switches in the MZ 80K power supply
4.2.
Procedures for starting the power supply - single operation
4.2.1.
Starting the UPS from complete shutdown
The following procedure should be used when starting up the power supply from the total off
state.
Warning
When performing the following procedure, voltage appears at the output
terminals of the power supply. If the receivers are connected to the power
supply output, check whether the power supply is safe. If the receivers are not
ready for power connection, make sure that they are safely isolated from the
UPS output.
警告
危 险