INSTALLATION
WALL DRILLING AND BRACKET FIXING
A vertical line up to the ceiling or up to the upper limit, at the center of the area in which the
hood is to be fitted.
A horizontal line
C
at a
X
A horizontal line
B
at
A horizontal line
A
at a
B
.
to the vertical reference line.
Repeat this operation on the other side and on the vertical reference line , checking that
the three marks are leveled.
to the vertical reference line.
Repeat this operation on the other side , checking that the two marks are leveled.
Mark a point (1) on the horizontal line
B
,
Mark a point (2) on the horizontal line
C
,
Mark a point (3) on the horizontal line
A
,
to the vertical reference line.
Repeat this operation on the other side , checking that the two marks are leveled.
above the cooker top.
inch above the horizontal line
C
B
(1)
A (3)
Vertical reference line
X
7.48"
below the horizontal line
1.57
"
6.69
"
36.61
"
-
40.55
"
7.48
"
B
.
3.15''
1.57
"
3.15
"
3.15
"
6.69
"
unit
:
inch
36.61" - 40.55"
1.57''
6.69''
Chimney
X
/
15.75"+11.81''
15.35''-
24.41''
15.75
"
Fix the brackets :
3/8''
drill bit.
Drill holes at the marked points with a
Insert the Wall Plugs 11 into the holes.
Fix the hood fixing bracket
20
with 3 screws
10
(
0.2''
x
1.97''
) at the horizontal line
B
.
Fix a Chimney fixing bracket
21
with 2 screws
10
(
0.2'' x 1.97''
) at the horizontal line
C
.
7