507868-02P
Page 9 of 48
Issue 1922
Roof Terminated
Exhaust Pipe
Furnace
Ventilation
Louvers
(Crawl Space)
*Intake Debris Screen Provided
Inlet Air
Minimum
12 in. (305mm)
above Crawl
Space Floor
Coupling or
3 in. to 2 in.
Transition
(Field Provided)
* See Maximum Vent Lengths table
NOTE-The inlet and outlet air openings shall each have a
free area of at least one square inch per 4,000 Btu (645mm
2
per 1.17kW) per hour of the total input rating of all equipment
in the enclosure.
Figure 8.
Equipment in Confined Space
(Inlet Air from Ventilated Crawl Space and Outlet Air
to Outside)
Figure 9.
Equipment in Confined Space - All Air from
Outside
Figure 10.
Equipment in Confined Space - all Air from
Outside
Shipping Bolt Removal
Units with 1/2 hp and 3/4 hp blower motors are equipped
with three flexible legs and one rigid leg. The rigid leg
is equipped with a shipping bolt and a flat white plastic
washer (rather than the rubber mounting grommet used
with a flexible mounting leg). See Figure 11. The bolt and
washer must be removed before the furnace is placed into
operation. After the bolt and washer have been removed,
the rigid leg will not touch the blower housing.
Figure 11.
Units with 1/2 HP & 3/4 HP
Blower Motor
Installation
Setting Equipment
Do not install the furnace on its front, back or in the
horizontal position. See Figure 13. Do not connect the
return air ducts to the back of the furnace. Doing so
will adversely affect the operation of the safety control
devices, which could result in personal injury or death.
WARNING