508146-01
Issue 2051
Page
58
of 7
0
30.
Reinstall pressure switches and reconnect pressure
switch wiring.
31.
Carefully connect combustion air pressure switch
hosing from pressure switches to proper stubs on cold
end header collector box.
32.
Reconnect condensate drain line to the cold end
header box.
33.
Use securing screws to reinstall flue collar to the top
cap on the furnace. Reconnect exhaust piping and
exhaust drain tubing.
34.
Replace flexible exhaust adapter on combustion air
inducer and flue collar. Secure using two existing hose
clamps.
35.
Reinstall burner box assembly in vestibule area.
36.
Reconnect flame roll-out switch wires.
37.
Reconnect sensor wire and reconnect 2-pin plug from
ignitor.
38.
Secure burner box assembly to vestibule panel using
four existing screws. Make sure burners line up in
center of burner ports.
39. Reinstall gas valve manifold assembly. Reconnect gas
supply line to gas valve.
40.
Reinstall burner box cover.
41.
Reconnect 2-pin plug to gas valve.
42.
Replace the blower compartment access panel.
43.
Refer to instruction on verifying gas and electrical
connections when re-establishing supplies.
44.
Follow lighting instructions to light and operate furnace
for 5 minutes to ensure that heat exchanger is clean
and dry and that furnace is operating properly.
45.
Replace heating compartment access panel.
Cleaning the Burner Assembly
1.
Turn off electrical and gas power supplies to furnace.
Remove upper and lower furnace access panels.
2.
Disconnect the 2-pin plug from the gas valve.
3.
Remove the burner box cover.
4.
Disconnect the gas supply line from the gas valve.
Remove gas valve/manifold assembly.
5.
Mark and disconnect sensor wire from the sensor.
Disconnect 2-pin plug from the ignitor at the burner
box.
6.
Remove four screws which secure burner box
assembly to vest panel. Remove burner box from the
unit.
7.
Use the soft brush attachment on a vacuum cleaner to
gently clean the face of the burners. Visually inspect the
inside of the burners and crossovers for any blockage
caused by foreign matter. Remove any blockage.
8.
Reconnect the sensor wire and reconnect the 2-pin
plug to the ignitor wiring harness.
9. Reinstall the burner box assembly using the existing
four screws. Make sure that the burners line up in the
center of the burner ports.
10.
Reinstall the gas valve manifold assembly. Reconnect
the gas supply line to the gas valve. Reinstall the
burner box cover.
11.
Reconnect 2-pin plug to gas valve.
12.
Replace the blower compartment access panel.
13.
Refer to instruction on verifying gas and electrical
connections when re-establishing supplies.
14.
Follow lighting instructions to light and operate furnace
for 5 minutes to ensure that heat exchanger is clean
and dry and that furnace is operating properly.
15.
Replace heating compartment access panel.