1.3. STARTUP
After finishing the inspection
of the previous installation points and making sure all the unit’s items are
correct the unit may be started.
1. UNIT CONTROL
Set the UNIT CONTROL switch on the ON position (Fig 2) to energize the control panel with 24 Volts.
After energizing the controller, wait five minutes for the unit to be on line and ready.
2. ON/OFF
Operation sequence will initiate by checking all security pre-programed points on the unit. If all
required conditions are OK the unit will be ready to initiate operation.
To start operation set the ON/OFF switch (Fig 2) to the ON position.
After six seconds the controller will command the start of the water pump.
If water flow is detected on the pipes, the internal sequence of the unit will begin.
3. COMPRESSORS
Set the APG1 switch, 24V (Fig. 2) to the ON position afterwards set the APG2 switch also to the ON
position, this will enable the compressors start cycle.
Note:
The APG4 switch (Fig. 3) selects the unit´s operating mode, whether is it cooling only or heat
pump. If you wish to operate the unit as heat pump turn this switch to ON.
Compressor
24V
Reset
Summary of Contents for CLIV-ACC-036-A3F
Page 2: ...Comfort Flex Rev February 5th 2016 Installation Manual CLIV Series...
Page 5: ...Comfort Flex Rev February 5th 2016 1 2 COMFORT FLEX INSTALLATION DIAGRAM...
Page 7: ...Comfort Flex Rev February 5th 2016 3 Technical Specs COOL ONLY...
Page 8: ...Comfort Flex Rev February 5th 2016 HEAT PUMP...
Page 10: ...Comfort Flex Rev February 5th 2016 ELECTRICAL DIAGRAM CLIV ACC 036 A3F CLIV ACC 060 A3F...
Page 13: ...Comfort Flex Rev February 5th 2016 6 DIMENSIONS...
Page 14: ...Comfort Flex Rev February 5th 2016 6 1 DIMENSIONS...
Page 15: ...Comfort Flex Rev February 5th 2016 Startup Manual CLIV Series...
Page 23: ...Comfort Flex Rev February 5th 2016 Fig 2CoolingOnlyMode Operation Manual CLIV Series...
Page 29: ...Comfort Flex Rev February 5th 2016 Maintenance Manual CLIV Series...