background image

3

4. Signal and Lamp Specification 

*If the situation will occur simultaneously, corridor light and master station lamp

will blink at once. 

(Corridor light, shower room, bed, interphone will blink by turns) 

5.1 Bed Paging 

- Lift up the handset or press the programmed dial button to answer the call. 

- Press the Dial Button to Communicate with each Bed. 

- While in conversation, Green led lamp will turn on and Call xxxx-Bed no will be

displayed  

- Can be communicated with patient in sub station directly  

5.2 Sub Station Function 

5.2.1 Communication with master station and sub station  

- Put the call button in sub station to communicate with master station, and then

green lamp will be lighted and white lamp in corridor will be lighted (in that case, 

the Led lamp in master station & alarm is warning) 

- Put the cancel switch to cancel the communication in sub station (LED in master

station display as Sub cancel REQ)   

5.2.2 Lift up the Handset in Master station for Communication. (Corridor Light will

be off) 

5.2.3 If the master station is on line, it will automatically flash the green led on the

bed for its conversation. If press the call button, it will be reserved with the   alarming

of red lamp, and then it will be automatically connected after the previous

conversation. 

5.3 Room broadcast function  

- Put the all paging and group call, each bed is on broadcast, so, it can be use the     

Group call with master station. 

- In case of using the group call, cannot be use the general call, however,

Emergency switch in toilet, shower room and presence switch is normally operated. 

5. How to use and Function 

www.safemag.ru

www.safemag.ru

Summary of Contents for JNS-PSM

Page 1: ...ou for purchasing COMMAX products Please carefully read this User s Guide in particular precautions for safety before using a product and follow instructions to use a product exactly The company is no...

Page 2: ...mmary 8 2 Work Condition 8 3 How to install between DSS and Master Station 8 4 How to install the Master Station 8 5 Bed connection 8 5 1 Bed Connection 8 5 2 Toilet Emergency Switch 8 5 3 Shower Room...

Page 3: ...t may cause an electric shock or a fire Do not forcibly pull out the cord from the socket If the cord is damaged it may cause a fire or an electric shock Do not put the plug in the socket with a wet h...

Page 4: ...or heating devices at a time of installation Install the product in a flat and stable place Otherwise it may not function properly Pull the plug if the product is not used for a long time If the produ...

Page 5: ...Inductor 4 way indication lamp Interphone Master Station 90 Circuits 2 2 System Dimension Master Station 240 L x 200 W x 90 H mm DSS 240 L x 129 W x 70 H mm 2 3 Power Requirement Power Source 220V In...

Page 6: ...idor will be lighted in that case the Led lamp in master station alarm is warning Put the cancel switch to cancel the communication in sub station LED in master station display as Sub cancel REQ 5 2 2...

Page 7: ...om can announce the emergency to nurse station through the call button in sub station 5 7 2 If the presence switch is on white corridor lamp will be automatically lighted and red corridor lamp will bl...

Page 8: ...d 3 It shall be paging from the bed for testing Refer to the drawing no 9 4 4 After completion the system will be ready to communicate 1 Switch Interphone No 1 64 Switch Interphone No 64 P Reject swit...

Page 9: ...isplay window input the number and press the remote control button No 1 Bed no No 2 Special Group Surgery Labour etc No 3 Inductor Group 8 1 Summary Describe the method of installation for a proper op...

Page 10: ...n It shall be connected between bed and bed with 4P connector 8 5 2 Emergency Switch Toilet Connection It shall be connected at the closest sub station connected in 3P connector CN6 no 1 2 8 5 3 Emerg...

Page 11: ...t each functional switch if each input will be functional the related output will be lighted 8 7 Inductor Connection The inductor shall be connected as the following schematic Refer to the drawing no...

Page 12: ...nection 8 8 Interphone Connection For TP 90AN connection or connection among the systems the interphone shal l be connected with 10 pieces of cable by parallel Refer to the drawing no 9 4 Main 1 Main...

Page 13: ...10 9 Nurse Call System 9 1 System Schematic Receiver to convert Receiver to be converted Power OFF Power ON www safemag ru www safemag ru...

Page 14: ...11 9 2 System Wiring Diagram 9 3 Parts Name and Connecting Method www safemag ru www safemag ru...

Page 15: ...12 9 3 Parts Name and Connecting Method www safemag ru www safemag ru...

Page 16: ...13 9 4 System Connection Schematic 9 5 Dimension www safemag ru www safemag ru...

Page 17: ...14 9 5 Dimension 9 5 1 Master Station JNS 1060 9 5 2 Main Control Panel JNS www safemag ru www safemag ru...

Page 18: ...15 9 5 3 Console Bed MGH Series 9 5 4 Sub Station JNS 101 9 5 5 Emergency Switch Toilet ES 410 9 5 6 Emergency Switch Shower Room ES 420 www safemag ru www safemag ru...

Page 19: ...16 9 5 7 Presence Switch PB 500 9 5 8 Inductor 9 5 9 Corridor Light CL 302C www safemag ru www safemag ru...

Page 20: ...9 5 10 Interphone 9 5 11 Bed Head Calling Unit PS 100C 9 5 12 Call Code CC 200 9 6 Fitting Materials 9 6 1 Coupling 9 6 2 Connector 9 6 3 Flexible Hose 9 6 4 UPT Cable 4P www safemag ru www safemag r...

Page 21: ...18 9 6 Fitting Materials 9 6 1 Coupling 9 6 2 Connector 9 6 3 Flexible Hose 9 6 4 UPT Cable 4P PE lscleled Par PVC LSZH www safemag ru www safemag ru...

Page 22: ...9 6 5 IV Cable 1 2mm 9 6 6 Concealed Box Corridor Light 9 6 7 Concealed Box Emergency Switch 19 Heat reslsting PVC isolated Conductor www safemag ru www safemag ru...

Reviews: