3.

 

Cut the insulated power conductors to length. Strip off 5mm of insulation from the 

conductors using an electrical wire stripper (12 AWG – 2.0mm; 14 AWG –1.6mm; 16 AWG – 

1.3mm; 18 AWG -1.0 mm; 20 AWG– 0.8mm; 22 AWG – 0.65mm; 24 AWG – 0.5mm). 

 

4.

 

Match the wire polarity from the cable plant with the terminal strip polarity, as shown in 

Figure 6

 

5.

 

Using a small flat screwdriver open the screw terminals until the wires insert into the 

terminal ports. Push each wire into its port. Screw each terminal down hand tight to make 

contact between the terminal and the wire conductor. Verify the wires are secure in the 

terminals with no exposed wire conductor, as shown in 

Figure 7

 

6.

 

Terminate the LC Fiber Optic plugs (see section 2) per the product specifications instructions. Visit 

www.commscope.com 

for LC Connector application, instructions, and tool kit information.

 

 

7.

 

Clean and install the LC terminations into the adapter; see installation and cleaning instructions: 

TECP-96-194. 

Store excess fiber on the spool, as shown in 

Figure 8

.

 

 

8.

 

Repeat steps 1 – 5  for all incoming PFCs.

 

 

 

 

 

           
 

Figure 7 

Figure 6 

Summary of Contents for 760230938

Page 1: ...ated PFC in a neat and orderly fashion that maintains physical separation of the different media types See the CommScope Product Catalog for available configurations 2 Tools and additional items required Round Cable Stripper Electrical Wire Stripper Large Flat Screwdriver Small Flat Screwdriver Power Drill Driver as needed Fiber optic termination and cleaning supplies CommScope 6 Port Fiber Adapto...

Page 2: ...s and connectivity label The G2 6 port fiber adapter can be ordered separately from www commscope com The TB is designed to accommodate up to six 6 PFC channels with each channel consisting of two power conductors and and one duplex fiber connection TX TR The TB is designed for indoor use and may be located in the plenum space Cable can enter the box through fire foam lined cable slots or through ...

Page 3: ...ion hardware must match the intended application with a minimum pull out requirement of 20 lbs f 88 N per hardware location 2 Attach 12 AWG or larger ground wire to the TB using the green ground screw as shown in Figure 1 Attach wire to Earth ground 3 Secure the ground wire to the strain relief bar with a supplied cable tie as shown in Figure 2 4 Insert the 6 port fiber adapter into the G2 opening...

Page 4: ...PFC into the TB and secure to the strain relief bar with a supplied cable tie as shown in Figure 4 Ensure adequate length for fiber slack 1 1 5 meters 2 Strip the outer jacket of the PFC using a round cable stripper so that there is approximately 25mm of jacket extending inside the box as shown in Figure 5 Trim any strength members or other cable components except for power conductors and fibers F...

Page 5: ...als until the wires insert into the terminal ports Push each wire into its port Screw each terminal down hand tight to make contact between the terminal and the wire conductor Verify the wires are secure in the terminals with no exposed wire conductor as shown in Figure 7 6 Terminate the LC Fiber Optic plugs see section 2 per the product specifications instructions Visit www commscope com for LC C...

Page 6: ...cable tie as shown in Figure 9 Ensure adequate length for fiber slack 1 1 5 meters 2 Separate the cable into three sections along the tear lines as shown in Figure 9 3 For the outgoing power termination repeat steps 3 5 from Section 6 Step 1 verifying any end device powered equipment wiring polarity with polarity connections on terminal strip as shown in Figure 10 Note Polarization indentation alo...

Page 7: ...LC Connector application instructions and tool kit information Note Furcation tubing can be used to protect coated fiber Visit www commscope com for a variety of colors 5 Clean and install the LC terminations into the adapter see installation and cleaning instructions TECP 96 194 Store excess fiber slack on the spool as shown in Figure 11 6 Repeat steps 1 5 for all outgoing PFCs Figure 9 Figure 10...

Page 8: ...ver 1 Fix the connectivity label to the inside or outside of cover and record the channel information as needed 2 Place the cover over the loose screw heads with the warning label facing outward and slide into place tighten the cover screws to secure as shown in Figure 12 Revision history Rev A Initial release Rev B 40132706CMO Figure 12 ...

Page 9: ...860660202 Rev B www commscope com Instruction Sheet 2021 CommScope Inc All Rights Reserved Page 9 of 9 ...

Reviews: