Page 7 of 8
© 2019 CommScope, Inc. All Rights Reserved
10. Close and Seal the Box
10.1.
Verify that the cover is installed properly with no
space between the housing and cover as shown.
Incorrect Alignment
Correct Alignment
10.2.
Secure by turning the locking screw clockwise.
9.5.
Secure the bundle of drop cables with cable ties to
the T-shapes of the drop cable bracket.
9.6.
Splitter Input Jumper Installation. A blue SC/APC
jumper has been provided and was factory installed between
Port 67 and the splitter input port. Jumper can be re-installed
to ports 68 to 90 if needed per customer requirements.
For better hand access to
input connector, the rear
dual fiber adapter may be
removed from plate by
loosening this screw.
Input
connector
Input
connector
adaptor port
68-90