5
2.8
Store the fibers which will be spliced day 1 to the splitter
modules.
2.9
Store the fibers which will be spliced day 1 for the point-to-
point applications.
3.4
Install the terminated drop cable in the numbered ports on the
base tray.
3.3
Wrap one layer of foam (20 mm) on the securing position if
needed. Terminate the aramid strength member by securing the cable/
pigtail onto the bracket with tie-wrap. Depending the amount of aramid
strength member, it needs to be wrapped twice around the bracket.
3.1
Install the drop cable seal and push through the drop cable.
3.2
Remove the outer jacket over a distance of 1.2 m.
3 Drop cables (point-to-point applications)
2
3