ADCP-96-167 • Issue 5 • July 2016
Page 48
© 2016, CommScope, Inc.
4. Open the cabinet door and swing frame to provide access to the interior of the
cabinet.
5. Insert the connectorized end of each MPO cable through the installed
compression fitting as shown in
and pull through about 36 inches of
cable slack into the cabinet.
Figure 43. Inserting MPO Cables into Compression Fitting
6. Place each MPO cable into one of the slots in the compression fitting grommet as
shown in
. Place bottom of grommet 36 inches from the end of the MPO
connectors.
7. From the inside of the cabinet, insert the compression fitting grommet into the
compression fitting.
Note:
Up to
six
3 mm MPO cables may be routed into the cabinet through each
designated entry/exit hole. All six cables should be installed at the same time.
PULL THROUGH
36 INCHES OF SLACK
MPO
CABLES (6)
24335-A