7
Central tube (loop)
4.4.4 Route the central tube directly to the basket and secure with tie-
wraps.
4.4.5 In case the tube is too stiff to route directly:
- cut the central tube back to 25mm;
- install spiral tubes over the tube and route to the basket;
- wrap some foam around the spiral tube underneath the tiwraps and
secure to the basket.
4.4.8 Store the uncut bare fibers into the basket and keep in place
with tie-wraps.
Note
: do not tighten the tie-wraps onto the fibers.
4.4.6 Cut the appropriate fibers and route them through a
transportation tube to the tray.
4.4.7 Secure the transportation tube to the tray with tie-wraps.
Note
: if necessary mark and remove the tube excess. The tube is 15 mm
onto the tray and has to make a smooth bend around the tray tower.
Summary of Contents for FOSC-450A
Page 15: ...15 ...