Splicing and Installing the Cable
To install two fusion or mechanical splice organizers (ordered separately) in the shelf:
1. Cut four 1.5 inch (3.8cm) pieces of double-sided tape (provided with the shelf).
2. Apply two pieces of tape to the underside of each splice organizer.
Do not cover the slots.
3. Affix the two splice organizers to the shelf approximately in the position shown in Figure 5 on page 6.
If you are using mass fusion splice organizers (ordered separately), you will need to install four splice organizers,
using the splice organizer holders (provided).
To install four mass fusion splice organizers:
1. Cut a 3 inch (7.5cm) piece of double-sided tape (provided with the shelf).
2. Apply the piece of tape to the underside of one of the splice organizer holders (also provided with the
shelf).
3. Insert two splice organizers into the holder.
4. Affix the holder and splice organizers to the shelf approximately in the position shown in Figure 5.
5. After you have finished splicing the fiber optic cable, stack the four splice organizers as shown in Figure 5.
6. Install the second splice organizer holder (provided with the shelf) as shown in Figure 5 so that it
attaches to the bottom holder and secures the splice organizers.
Figure 5 Installing Mass Fusion Splice Organizers Using Holders
Splice organizer holder
Splice organizer holder
Splice organizer