ADCP-93-095 • Rev B • April 2018
Page 9
© 2018, CommScope, Inc.
4
UNPACKING THE PRODUCT
Unpack and inspect the LSX panel as follows:
1. Inspect the exterior of the shipping container for evidence of rough handling that may have
damaged the contents of the container.
2. Unpack the panel and associated components and check for possible damage.
3. If damage is detected or if parts are missing, file a claim with the commercial carrier and
then notify CommScope Customer Service. Save the damaged carton for inspection by the
carrier.
4. Save the shipping container for use in case the equipment requires shipment at a future
date.
5
INSTALLATION
The main steps in installing an LSX panel are:
• Mounting the panel on the frame,
• Breaking out the cable to be spliced within the panel,
• Installing the cable on the outside of the panel, and
• Routing the cable within the panel from the cable clamp to the splice deck.
For instructions, refer to the following subsections.
5.1
Installing the Combination Module
Install the panel from the front side of the rack, using the following procedure. Refer to
.
Note:
For information on how to contact CommScope Customer Service, if needed, refer
to
in this manual.
Note:
Because of its extra depth due to its rear splice area, the LSX panel should be
installed on an LGX fiber distribution frame with a depth of at least 15 inches (38.1 cm).