ADCP-93-095 • Rev B • April 2018
Page 26
© 2018, CommScope, Inc.
6.2.5
Routing Patch Cords Starting in the Upper Raceway
To cross-connect starting in the upper raceway, use the following procedure. Refer to
and
1. Terminate one end of each patch cord on the originating panel and bay and then route the
patch cord left or right to the nearest vertical trough.
2. Route the end of the patch cord terminated in step 1 up the left or right vertical trough to
the upper raceway.
3. At the destination panel and bay, terminate the opposite end of the patch cord and then
route the patch cord left or right to the nearest vertical trough.
4. Route the patch cord terminated in step 3 up the left or right vertical trough as shown in
.
Figure 22. Routing Patch Cords in the Upper Raceway (Top to Top)
BAY
BAY
BAY
17540-A
ORIGINATING
TERMINATION
LOCATIONS
DESTINATION
TERMINATION
LOCATIONS
JUMPER
RETAINERS
JUMPER
SUPPORT
BRACKETS
VERTICAL
TROUGH
VERTICAL
TROUGH
VERTICAL
TROUGHS
VERTICAL
TROUGHS
VERTICAL
TROUGHS
UPPER
RACEWAYS
1
2
5
4
3