Page 10 of 10
© 2019 CommScope, Inc. All Rights Reserved
10
Mounting options
•
Wall fixation: use mounting tabs.
•
Pole fixation: use mounting tabs in combination with
plastic or metal hose clamps.
• Strand mount: OFDC-C12 BRKSTRAND (To be ordered
separately).
11
Trademarks and patents
All trademarks identified by ® or ™ are registered
trademarks or trademarks, respectively, of CommScope,
Inc. This document is for planning purposes only and is
not intended to modify or supplement any specifications
or warranties relating to CommScope products or services.
CommScope is committed to the highest standards of
business integrity and environmental sustainability, with a
number of CommScope’s facilities across the globe certified
in accordance with international standards, including ISO
9001, TL 9000, and ISO 14001.
Further information regarding CommScope’s commitment
can be found at
www.commscope.com/About-Us/Corporate-Responsibility-
and-Sustainability.
This product may be covered by one or more U.S. patents or
their foreign equivalents. For patents, see www.cs-pat.com.
12
Contact information
Visit our website or contact your local CommScope
representative for more information.
For technical assistance, customer service, or to report any
missing/damaged parts, visit us at:
http://www.commscope.com/SupportCenter
9�3
Demarcation cover
Demarcation cover can be locked in open position.
9�4
2 cables per port
9.4.1
Cut 2 cm (0.78 inch) of gel strip (to be ordered
seperately) and place the gel strip on top of the first drop
inside the port.
9.4.2
Prepare the 2nd cable as standard practice.
Cut 1 of the black cable tie of first cable, put the 2nd drop
on top of the gel strip and push down, secure both cables
together on the inside with 1 white cable tie and outside with
2 black cable ties to the bracket.