Page 4 of 10
© 2019 CommScope, Inc. All Rights Reserved
6�2
Drop cable preparation, routing and
splicing at tray 1
6.2.1
Remove the jacket over 1 m/39.37 inches. Clean
the jacket and apply a layer of foam at 40 mm/1.57 inch-
es from the jacket end. When aramid is present, cut it to a
length of 100 mm/4 inches.
6.2.2
Install the drop cable and secure it to the external
bracket with 2 cable ties (black).
6.2.3
Secure the aramid with screw and cut the excess
aramid.
6.1.7
Store the looped bundles as shown.
6.1.8
Position the gel segment back in place over the
cables.
6.1.9
Move to the back side of tray 1. Install the splice
holders and store the uncut bundle.