ADCP-96-040 • Rev D • January 2018
Page 11
© 2018, CommScope, Inc.
Figure 10. Installing the Universal Mounting Bracket (UMB)
After the UMB is mounted, install the MST in the UMB as shown in
Figure 11
. Insert the
cable end of the MST into the UMB first and then push the front of the MST into the
UMB until the latch snaps closed.
USE CENTER HOLES
WHEN SECURING UMB
WITH LAG SCREWS
USE SIDE HOLES WHEN
SECURING UMB WITH
CONSTRUCTION SCREWS
POLE-MOUNT
STRAND-MOUNTING THE UMB
USING Deltec® CABLE STRAPS
STRAND-MOUNT
STRAND-MOUNT BRACKET
KIT (MST-ACC-M02). REFER TO
ADCP-96-124 FOR THE BRACKET
KIT INSTALLATION PROCEDURES
HAND-HOLE
LEDGE MOUNT
HAND-HOLE
HANGER MOUNT
HAND-HOLE SWING
ARM MOUNT
FLAT BRACKET MOUNT
(HAND-HOLE OR
PEDESTAL)
#8-16 X 1/2 INCH
THREAD ROLLING
SCREWS FOR PLASTIC
CAPPED HOLES
#10 X 1 INCH
SELF TAPPING
SCREWS
#10 X 2 INCH
SCREWS,
WASHERS,
NUTS
1/4 X 1-1/2 INCH
LAG SCREWS
#10 X 1 INCH SELF
TAPPING SCREWS
23154-A